In particular, there are two main stages in the construction of a volleyball court, these are infrastructure phase and the iron construction phase. In this article we are going to explain every single detail in volleyball court step by step and what kind of equipment you are going to need in this process. First of all, we need to get some information about the infrastructure phase in the construction of a volleyball court.

 

How Is the Infrastructure Phase in Volleyball Court Construction?

As a first step, the ground is leveled to zero code and compacted with a vibratory roller. Excavation is made on the compacted ground, approximately 20 cm below the ground level for the perimeter line. Then, a double-faced wooden formwork with a width of 25 cm and a height of 40 cm is attached to the excavation site. After this work is done, two lower and upper two iron reinforcements with 12mm diameter are placed inside the mold and 8mm diameter stirrups are connected at 30cm intervals.

In addition to these stages of volleyball court construction, the stirrups are attached, the anchor pipes 89x3mm are fixed to the iron reinforcement at 3m intervals to the places where the perimeter poles are going to come. As a different option, after the beam concrete is completed, the plates are fixed to the beam concrete with the steel dowel system. A perimeter beam is formed by pouring C-20 dose of ready-mixed concrete into the perimeter molds. C-20 ready-mixed concrete 12-15 cm high with mesh steel reinforcement is poured on the crushed stone, which is leveled, by giving a slope of approximately 0.5%. After the poured concrete is corrected, it is waited by irrigation for 15 days for drying.

At the end of the curing period of the concrete floor, 5 cm high zero asphalt is laid and compacted with a roller. It is waited for at least 15 days for gas removal in order to be able to apply on the compressed asphalt floor.

 

How About the Iron Construction Phase in Volleyball Court Construction?

volleyball

After the infrastructure phase of the volleyball court construction is completed, 76x3mm pipes with a height of 4m are vertically welded to the pipes 89x3mm placed on the concrete line. Three rows 60x2.5mm pipes are fixed horizontally by welding to the uprights. 60x2,5mm pipes are fixed by welding diagonally to the long and short side corners of the field.

For lighting, cascading projector poles are created by using 60x2.5mm pipes between four pieces of 5m high 76x3mm pipes on the long sides of the field. A hinged door is made from 60x2.5mm pipe from the place deemed suitable for the construction. The construction of the volleyball court is completed by painting all iron production in two layers with special metal rust paint.

 

What Kind of Stages Should Be Done After These Phases in Volleyball Court Construction?

Especially the net-wire mesh, lighting – electricity, and then flooring systems are going to be done in volleyball court construction as final steps. If we need to explain what kind of works is done in these steps, we are going to explain them respectively. In the iron construction, the volleyball court is covered with a 4m high 40x40mm mesh size, 3.5mm wall thickness, dipped galvanized PVC coated spiral wire mesh. Interconnections of the wire mesh and volleyball net covered is made ready for use by making attachments.

For the main electrical line to be used for lighting, TSE certified rubber insulated 4x4 NYY cable is fixed to the construction and lowered from a single center to the place where the electrical panel is going to be located. A 10x10 box junction box is placed in the center of each lighting pole for connections. Output from the luminaires with a 3x2.5 TTR cable is made and connections are made to the mainline in the junction box. In the completed construction, and IP 65 class electrical panel is placed in a suitable place.

 

What Kind of Flooring System Should Be Preferred in Volleyball Court Construction?

volleyball-court

The first criterion determining which material to use is which sports art is going to be performed on the floor and the second criterion is the location of the sports field as indoor and outdoor areas. Each of these sport court flooring systems has so many characteristic features and if we do not know these details definitely we are going to make a wrong choice for the sports fields. Therefore, it is so important to know which flooring system is going to be suitable for the specific sports fields. 

Acrylic flooring, which is highly resistant to climatic conditions and thermal changes, looks quite aesthetic and hygienic. On the other hand, the tartan floor is extremely preferred due to its high flexibility. Moreover, this flooring system has many attractive features such as impact absorbency, UV resistance, non-deformable structure in thermal differences, hygienic and environmentally friendly, easy to clean, and many others. The polyurethane coating is quite effective and protective and so much easier to clean when we compare it with other options. This sports court flooring is applied on concrete surfaces as a cast-in-place and it does not allow the creation of joints. Also, an artificial grass flooring system might be so suitable for a volleyball court ground. This product has resistant to any kind of circumstances that you might come across. They do not fade out or wear out over time.

But there is one more significant point in the volleyball court construction stages: the company which you are going to work with. At this point, we can recommend Integral Group for you. Because this experienced company has been manufacturing products which you are going to need in volleyball court construction process. Due to its top-quality service this company has so strong business connections all around the world. They have been exporting many innovative products to the USA, the UK, Morocco, Algeria, Malta, the Philippines, France, Italy, and many others. If you are willing to start up a new volleyball court, you should definitely check their products out!